Free checklist

Title 24 permit submittal checklist.

Use this before permit assembly to catch the project details that usually drive California Title 24 questions, HERS coordination, and late corrections.

Want the checklist sent back with notes?

No newsletter trap. This sends a project-context email to Strata.

Pre-permit review

What to gather before the Title 24 report starts.

The package does not need to be perfect. It needs to be clear enough to identify the compliance path before assumptions harden.

  1. Project basics

    City/jurisdiction, address or APN, occupancy, project type, and target permit timing.

  2. Plan set

    Floor plans, elevations, sections, roof plan, and any current architectural sheets.

  3. Envelope assumptions

    Wall/roof/floor assemblies, insulation values, glazing area, window/door schedules, and orientation.

  4. Mechanical scope

    HVAC equipment type, efficiency, duct location, ventilation approach, and any known substitutions.

  5. Water heating

    Water heater type, distribution assumptions, recirculation details, and fixture notes if available.

  6. Solar/battery notes

    PV, battery, exception, or existing-condition details that may affect the compliance path.

  7. Field verification

    Likely HERS measures, installer/testing coordination, and closeout documents needed later.

  8. Open questions

    Any plan-check comments, late equipment changes, unusual glazing, additions/remodel constraints, or city concerns.

Next step

Have plans or comments already?

Send the project type, city, timing, and open question. Strata can help decide whether the next move is a report, documentation review, or coordination call.

Discuss your project