---
title: "Services"
description: "Compare Strata Energy Solutions services for Title 24 reports, CALGreen documentation, HERS coordination, inspections, and HVAC permit support."
---


# Title 24, CALGreen, HERS, and inspection services.

Choose the scope that matches the project stage: permit reports, CALGreen documentation, HERS coordination, inspection support, or a bundled HVAC permit path.

Use this page to match the project need to the right compliance scope. Some teams need one report for plan check. Others need documentation, field verification, and contractor coordination handled together.

## Start with the problem the city, builder, or inspector needs solved.

- **Permit submittal:** Use Title 24 and CALGreen documentation when the project needs a clear review package for plan check.
- **Construction coordination:** Use HERS and HVAC support when equipment, duct design, installation details, and testing need one coordinated path.
- **Closeout pressure:** Use inspection and documentation support when the project is trying to resolve field items without reopening the whole permit strategy.

## Pick the service by deliverable.

Reports, forms, inspections, and coordination each solve a different problem. The service list below keeps those differences visible.

### CALGreen Documentation

CALGreen documentation prepared for smoother submittals and clearer field coordination.

Strata organizes CALGreen requirements into documentation the city can review and the project team can follow. The package stays clear, coordinated, and easier to use during construction.

- CALGreen forms and supporting documentation
- Requirement mapping tied to the project scope
- Coordination with the overall permit package

### HERS Testing

HERS testing and verification support that keeps the approved compliance path on track.

Strata coordinates HERS testing with builders, installers, and field teams so verification happens at the right time and does not become a scramble at the end of the job.

- Testing coordination with the project team
- Field communication with installers
- Reporting for final approval and closeout

### Title 24 Compliance

Title 24 reports and energy calculations prepared for California permit review and real project constraints.

Strata prepares Title 24 documentation that fits the design, the schedule, and the way the project will actually be built. The goal is to reduce late revisions and keep plan check moving.

- Title 24 reports for permit submittal
- Coordination with architects, designers, and builders
- Compliance strategy that fits the project scope

### CALGreen Inspection

On-site CALGreen inspection support to verify that documented requirements are being carried through in the field.

Strata helps catch documentation and installation gaps before final review. That reduces avoidable rework and keeps the approval path clearer.

- Construction-phase inspection support
- Issue spotting before final approval
- Continuity between permit documents and field work

### HVAC Permit + HERS Bundle

Combined HVAC permit and HERS coordination for contractors who want one simpler compliance path.

Bundling the permit and HERS scope cuts down on handoffs, keeps communication in one lane, and makes scheduling easier from submittal through testing.

- One contact path for permit and testing
- Fewer fragmented project updates
- Simpler scheduling across the job

### Mechanical Engineering

Mechanical engineering support that keeps HVAC decisions, compliance assumptions, and permit documentation aligned.

Strata helps project teams connect mechanical design decisions to the energy compliance path, equipment selections, and permit requirements so mechanical scope does not become a late-stage revision problem.

- HVAC load and equipment coordination
- Mechanical scope review for permit alignment
- Coordination between design documents, Title 24 assumptions, and field needs

### Plumbing Engineering

Plumbing engineering support for project teams that need cleaner permit coordination and practical documentation.

Strata helps coordinate plumbing scope with the broader permit package so fixture assumptions, water-heating decisions, documentation, and field requirements are easier for the team to follow.

- Plumbing scope and fixture coordination
- Water-heating and documentation alignment
- Permit-focused review of plumbing requirements

## What teams usually need from Strata.

- **CF1R / energy report:** Permit-ready compliance documentation
- **CALGreen forms:** Clear requirement tracking and review support
- **HERS coordination:** Testing path tied to approved assumptions
- **HVAC permit bundle:** One contact for permit and field verification

## Popular local service pages.

A few practical service-area entry points for teams comparing requirements by city, region, or permit stage.

- [CALGreen Documentation in Brentwood](/services/calgreen-documentation/brentwood.md) - CALGreen documentation Brentwood
- [CALGreen Documentation in Sacramento](/services/calgreen-documentation/sacramento.md) - CALGreen documentation Sacramento
- [CALGreen Documentation in Seattle](/services/calgreen-documentation/seattle.md) - CALGreen documentation Seattle
- [HERS Coordination in Brentwood](/services/hers-testing/brentwood.md) - HERS coordination Brentwood
- [HERS Coordination in Sacramento](/services/hers-testing/sacramento.md) - HERS coordination Sacramento
- [HERS Coordination in Seattle](/services/hers-testing/seattle.md) - HERS coordination Seattle
- [Title 24 Compliance in Brentwood](/services/title-24-compliance/brentwood.md) - Title 24 Compliance Brentwood
- [Title 24 Compliance in Sacramento](/services/title-24-compliance/sacramento.md) - Title 24 Compliance Sacramento
- [Title 24 Compliance in Seattle](/services/title-24-compliance/seattle.md) - Title 24 Compliance Seattle

## Every scope follows a simple review path.

The process is consistent, but the deliverable changes by service: report, documentation package, field verification, or bundled permit support.

- **1:** Review the project constraints - Plans, property type, timing, and performance goals are reviewed first so the compliance path starts with the right assumptions.
- **2:** Shape the compliance strategy - Title 24, CALGreen, and field requirements are translated into a scope the project team can actually carry through design and construction.
- **3:** Deliver permit-ready documentation - Reports, notes, and supporting documents are prepared for city review and for smoother coordination inside the project team.
- **4:** Support field verification - Testing and inspection are coordinated so the approved path carries through installation, verification, and final closeout.
